Thursday, May 25, 2023

Padma Bridge Update Video 2021 | Traveler Mahbub | Padma Bridge Latest News | Padma Setu Update News

 পদ্মা ব্রিজের নির্মাণের পূর্বের চিত্র: পদ্মার বুকে ফেরি থেকে তোলা চিত্র


#PadmaBridge Update Video 2021 is a 4K bridge video by Traveler Mahbub. The Padma Bridge, also called as #PoddaSetu locally. The Padma Bridge's length is about 6.150 km (3.821 mi) which is the longest bridge in Bangladesh. The Padma Bridge update news was inaugurated on 25th June 2022. The last span of Podda Bridge Bangladesh has been set and the whole bridge is now visible. USD $3,692,000,000 Padma Bridge Cost has been totally carried out by the country's own funds.

Padma Bridge Update Video 2021 by Traveler Mahbub is Padma Bridge Latest News or Padma Setu Update News video for you. It's a multipurpose road-rail bridge across the Padma River, the main distributary of Ganges, under construction in Bangladesh with its own resources after the Padma Bridge controversy with the World Bank. Padma Bridge connects Louhajong, Munshiganj to Shariatpur and Madaripur linking the south-west of the country, to north-eastern regions. Padma Multipurpose Bridge is considered to be the most challenging construction project in the history of Bangladesh. The two-level steel truss bridge carries a four-lane highway on the upper level and a single track railway on a lower level. The bridge with 150.12 m (492.5 ft) long 41 spans, 6.150 km (3.821 mi) total length and 18.18 m (59.6 ft) width, is the longest bridge in Bangladesh, the second longest in the Indo-Gangetic Plain after Bhupen Hazarika Setu in Assam and the longest over Ganges in terms of both span and the total length. The highest depth of pile of this bridge is 122 meter, which is highest among all other bridges. Padma Multipurpose Bridge, when commissioned, is expected to boost the GDP of Bangladesh by as much as 1.2 percent. Component of the project : Main Bridge: River Training Works(RTW) Janjira Approach Road & Selected Bridge End Facilities Mawa Approach Road & Selected Bridge End Facilities Service Area-2 Resettlement Environment Land Acquisition CSC(Main Bridge & RTW) CSC(Approach Roads & Service Area-2) Engineering Support & Safety Team(ESST) Main Bridge 6,150 m (20,180 ft): Contractor : China Major Bridge Engineering Co. Ltd, China Contract Period: 4 years+1 years (defect liability period) Total No. of Trees Planted: 1,69,957 Total Land Acquisition: Munshiganj: Acquired: 329.64 hectares, Handed Over: 319.92 hectares Madaripur: Acquired: 1601.19 hectares, Handed Over: 553.18 hectares Shariatpur: Acquired: 610.96 hectares, Handed Over: 579.95 hectares Date of Work Order: 1 August 2006
Date of Completion: 31 December 2019 [Source: Wikipedia]

No comments:

Post a Comment

Nature Escapes: Unveiling Serenity Through Travel & Tours 🌿✈️

Embark on a journey of tranquility with our "Nature Escapes" series, where each video is a visual symphony of breathtaking landsca...